New Urban Development Proposes View 29 With Affordable And Workforce Housing In Wynwood
New Urban Development, an affiliate of non-profit organization The Urban League of Greater Miami, has proposed View 29 in Wynwood. The residential project is located at 2901 NW 2nd Ave. and will offer a mix of affordable and workforce housing to help address the shortage of affordable housing in Miami.
New Urban Development, an affiliate of non-profit organization The Urban League of Greater Miami, has proposed View 29 in Wynwood. The residential project is located at 2901 NW 2nd Ave. and will offer a mix of affordable and workforce housing to help address the shortage of affordable housing in Miami. The 27,717 SF site was deeded by the county to New Urban Development in 2020 in exchange for the development of affordable and workforce housing.
View 29 is designed by MC+G Architecture and will rise 12-stories, offering 116 apartment units, 105 parking spaces and 6,910 SF of ground floor retail. The unit mix is expected to offer 30 studios, 18 one-bedroom units, 58 two-bedroom units and 10 three-bedroom units. Residences would range from 650 SF to 1,200 SF. Amenities will feature a pool, community room, childrens’ room, fitness center, yoga room, business center and a rooftop terrace with a solar panel canopy. The Wynwood Design Review Committee is scheduled to review the proposal on May 12.
Check Out The Newly Revealed Renderings Of Norman Foster-Designed Drivers Club Miami
New renderings have been revealed of Drivers Club Miami, a Norman Foster-designed private driving club with resort on 160-acres in Carol City, a neighborhood of Miami Gardens. The project was approved in 2018 although groundbreaking has been delayed by zoning agreements, environmental testing, design meetings and construction-preventing covenants.
New renderings have been revealed of Drivers Club Miami, a Norman Foster-designed private driving club with resort on 160-acres in Carol City, a neighborhood of Miami Gardens. The project was approved in 2018 although groundbreaking has been delayed by zoning agreements, environmental testing, design meetings and construction-preventing covenants. The project is being developed by 13 Pista LLC, led by Carlos de Narvaez Steuer and is estimated to cost $100 million.
Drivers Club Miami will feature a race circuit with 2.3 mile track in addition to a luxury resort with hotel, retail and restaurants which will be open to the public. The Miami Drivers club track, clubhouse and vehicle storage and maintenance facilities will be private for members only.
Miami-Dade County signed a $33.4 million, 30 year lease for 140 acres of land below-market rate at 20000 NW 47th Ave. for the project. The lease began on August 1, 2018 and has two 30-year extension options. The county will also provide $2 million to the developer via subsidies in order to help the project create 220 jobs on the property. In exchange for waiving the competitive bidding process, the developer will build public improvements for Miami Gardens including a new public bicycle course and capital contributions to support a new on-site fire station and Florida Memorial University. The entire project is estimated to cost roughly $100 million.
Miami Beach Issues Request For Letters Of Interest For Developers To Develop Lincoln Road City Owned Lots
The City of Miami Beach has issued a request for letters of interest from developers to develop three city-owned lots on the north side of Lincoln Road. Miami Beach is seeking a developer to build class A office buildings with on-site parking garages via a public-private partnership with the city with the goal of creating a business district to help diversify Miami Beach’s economy which is heavily reliant on tourism and hospitality.
The City of Miami Beach has issued a request for letters of interest from developers to develop three city-owned lots on the north side of Lincoln Road. Miami Beach is seeking a developer to build class A office buildings with on-site parking garages via a public-private partnership with the city with the goal of creating a business district to help diversify Miami Beach’s economy which is heavily reliant on tourism and hospitality. The properties are currently operated as parking lots located at 1664 Meridian Ave., another between Lenox Avenue and Michigan Avenue, and a lot at the southwest corner of 17th Street and Lenox Avenue. The development sites span a total of 3.35 acres can be combined to develop up to 383,439 square feet of office space. Voters would still have to approve any project on city owned land through a referendum. Developers must submit letters of intent by 3 PM on January 11.
Miami Heat Star Udonis Haslem And Magellan Housing Score Approval To Build Wynwood Works On City Owned Land
A partnership between Haslem Housing Ventures, led by Miami Heat star Udonis Haslem, and the Coral Gables-based Magellan Housing, have received approval from Miami’s Omni Community Redevelopment Agency (CRA) to build Wynwood Works, a 12-story mixed-use apartment project in Wynwood. Wynwood Works will be built on city owned land at 2035 North Miami Avenue.
A partnership between Haslem Housing Ventures, led by Miami Heat star Udonis Haslem, and the Coral Gables-based Magellan Housing, have received approval from Miami’s Omni Community Redevelopment Agency (CRA) to build Wynwood Works, a 12-story mixed-use apartment project in Wynwood. Wynwood Works will be built on city owned land at 2035 North Miami Avenue.
The development partnership will receive a land grant from the CRA valued at $6.5 million at no charge and a contribution of $9.9 million cash grant in exchange for 50 years of income restrictions on the apartments. The total project costs are estimated at $39.9 million and with the grands provided by the CRA the development partnership will not need to seek Low-Income Housing Tax Credits (LIHTC). In 2018 the Omni CRA committed $100 million to the development of affordable housing. The development partnership will restrict 10% of the units to those earning up to 30% of the area median income (AMI), an additional 10% of units to those earning up to 50% of AMI, another 10% to those earning up to 80% of AMI, 25% up to 120% of AMI and the remaining 45% for those earning up to 140% of AMI. The partnership will also share 45% of the annual rental income from the ground-floor retail.
Wynwood Works will rise 12-stories and will feature 104-units of mixed-income apartments on a 20,238 square foot site. The project is designed by MC+G Architecture and will feature a mural designed in partnership with the Miami Light Project and Bakehouse Art Complex. Wynwood Works will also feature 6,711 square feet of ground-floor retail, 102 parking spaces and a sixth-floor amenity deck which features a fitness room, co-working space, a community room and a garden. Apartments will range from 405 square foot studios to 1,150 square foot 3-bedroom layouts. The unit mix will be broken down by 42 studios, 43 one-bedroom units, 12 two-bedroom units and 7 three-bedroom units.
Amazon To Build Largest Distribution Center in South Florida After Scoring Approval From Miami-Dade County
Miami-Dade commissioners have voted unanimously to sell a vacant lot located at 13200 Southwest 272nd Street near the Homestead Air Reserve Base in South Miami-Dade County to Amazon for $22,056,853, clearing the way for Amazon to build a new distribution center to service South Florida.
Miami-Dade commissioners have voted unanimously to sell a vacant lot located at 13200 Southwest 272nd Street near the Homestead Air Reserve Base in South Miami-Dade County to Amazon for $22,056,853, clearing the way for Amazon to build a new distribution center to service South Florida. Amazon will invest $80 million into the property to build out the distribution center which will be a minimum of 1 million square feet and could become the largest in the region. The distribution center would be used to distribute products including food, produce and groceries. The facility is expected to create at lease 325 permanent full-time jobs with an annual salary of $32,000. 25% of the funds paid by Amazon to acquire the site will be dedicated to the Miami-Dade Affordable Housing Trust and the remaining funds will be allocated to the Homestead Air Reserve Base Fund. The South Miami-Dade facility would be the 4th distribution center used by Amazon in the South Florida region.
13th Floor Investments & Adler Group Lock Down $99 Million In Construction Financing For 2nd Tower At Link at Douglas
Miami-based real estate developers Adler Group and 13th Floor Investments have finalized a $99 million loan that will open the door to the construction of a second tower at Link at Douglas, a 7-acre master-planned development that will transform Miami-Dade County’s Douglas Road Metrorail Station into a mixed-use transit hub with residential, retail and commercial office uses.
Miami-based real estate developers Adler Group and 13th Floor Investments have finalized a $99 million loan that will open the door to the construction of a second tower at Link at Douglas, a 7-acre master-planned development that will transform Miami-Dade County’s Douglas Road Metrorail Station into a mixed-use transit hub with residential, retail and commercial office uses. The loan, which was issued by Banco Santander and TD Bank, will help fund the construction of the 36-story multifamily building, which will include 421 rental apartments and 17,000 SF of ground-floor retail space.
Situated directly adjacent to the Douglas Road Metrorail Station at 3100 Douglas Road, the Arquitectonica-designed building will also feature a public plaza with connectivity to The Underline, a 10-mile-long linear park being built underneath the Metrorail tracks running from Downtown Miami to South Miami.
Construction of Tower 2 is expected to get underway this month (February 2020) and is expected to be completed in late 2022. Tower 1, a 22-story multifamily building designed by Corwil Architects with 312 rental apartments and 6,000 SF of retail space, broke ground in July 2019 and is slated for completion in 2021.
“The closing of this construction loan is a testament to our strong bank relationships and also signals the continued confidence in our latest transit-oriented development, as well as our ability to execute as a development team,” said Daryl Shevin, CFO of 13th Floor Investments.
“Link at Douglas will set a standard for urban living by catering to Miami-Dade’s evolving residents, who are looking for ways to avoid road congestion through public transit while seeking a more connected lifestyle,” said Jonathan Raiffe, Chief Operating Officer of Adler Group.
Link at Douglas is being developed through a collaboration with Miami-Dade County in which the developers have entered into a ground lease for publicly-owned land that will usher in privately-funded transit and infrastructure upgrades at a critical connection point within the County’s transit system. Link at Douglas’ mobility plan includes connectivity to Metrorail, County buses and municipal trolleys. Additionally, the development will incorporate over $17 million in public infrastructure improvements, including a fully renovated Metrorail station, a public plaza with active retail, and a section of The Underline. Link at Douglas marks the second partnership for 13th Floor Investments and Adler Group. The development team recently completed Motion at Dadeland, a 294-unit transit-oriented rental community adjacent to South Miami’s Dadeland North Metrorail Station, which opened to renters in April 2019.
Australia’s Plenary Group Submits Plans For Miami-Dade CivilCourthouse in Downtown Miami
Plenary Group, a Melbourne, Australian real estate development firm who was awarded the contract to build the new Miami-Dade Civil Courthouse in Downtown Miami, has submitted plans to the FAA for review. The proposal calls for a 435’ tower rising 23-stories and the developer plans to break ground by this May, 2020.
Plenary Group, a Melbourne, Australian real estate development firm who was awarded the contract to build the new Miami-Dade Civil Courthouse in Downtown Miami, has submitted plans to the FAA for review. The proposal calls for a 435’ tower rising 23-stories and the developer plans to break ground by this May, 2020. In 2019 The Plenary Group was awarded a $267 million contract to design, build and operate Miami-Dade’s Civil Courthouse at 73 West Flagler Street on county owned land, replacing the 1928-era courthouse that was also the location of the infamous Al Capone trial. The courthouse will feature 46 courtrooms and 59 parking spaces.
Miami-Dade County has called the partnership between Miami-Dade County and the Plenary Group to be the first public-private partnership by the County. Plenary Group will use private funds and will both built and operate the facility with a 30-year contract which could be valued at nearly $27 million per year. The annual payments are performance based and Plenary Group must hit hurdles for operational and maintenance standards. Plenary Group will not start receiving payments until the courthouse is open and operational. HOK is the architect for the project and Tutor Perini is the contractor. Completion is expected in 2024.
Vertical Construction Underway At ROVR Development's Grand Station In Downtown Miami
Construction teams have passed the 6th floor of vertical construction at Grand Station Partners’ Grand Station apartment tower, located at 40 Northwest 3rd Street in Downtown Miami, also known as Parcel B. Grand Station Partners is a public-private development partnership led by ROVR Development and its principals Oscar Rodriguez and Ricardo Vadia.
Construction teams have passed the 6th floor of vertical construction at Grand Station Partners’ Grand Station apartment tower, located at 40 Northwest 3rd Street in Downtown Miami, also known as Parcel B. Grand Station Partners is a public-private development partnership led by ROVR Development and its principals Oscar Rodriguez and Ricardo Vadia. When complete Grand Station will rise 30-stories, 322’, and offer 300 rental units within walking distance of MiamiCentral Station, Virgin Trains (Brightline) and Metromover. Units will range in size from 463 SF to 957 SF and will come in studio, 1-bedroom and 2-bedroom floorplans. Grand Station will also offer 350 parking spaces and 5,000 SF of retail space. Amenities will include a pool deck with spa, fitness center, social area and rooftop deck. The building was designed by Zyscovich Architects and Ortega is the general contractor. The construction costs of the project are estimated to be roughly $50 million. Grand Station is expected to be completed in the Spring of 2021.
The Mess At Melreese Golf Club Gets Worse As Miami Freedom Park Gets Delayed Again
There is just no telling where the supposed deal to bring a professional soccer stadium to Miami will end up after Miami city commissioners voted on Tuesday to continue negotiations with the group, led by Jorge Mas of MasTec, in regards to the projected $1 billion mixed-use office and retail project.
There is just no telling where the supposed deal to bring a professional soccer stadium to Miami will end up after Miami city commissioners voted on Tuesday to continue negotiations with the group, led by Jorge Mas of MasTec, in regards to the projected $1 billion mixed-use office and retail project. Although Miami has a state-of-the-art stadium in Hard Rock Stadium, Inter Miami CF has decided that they need a dedicated soccer stadium to accommodate what are expected to be masses of fans, albeit one that is decidedly much smaller than the capacity Hard Rock Stadium could accommodate. It was proposed to voters that they could “vote to bring a soccer stadium to Miami along with a public park” where the public Melreese Golf Course currently operates, which passed in 2018.
Since then plans have changed significantly. The public park portion has been significantly scaled back to being a nearly non-existent part of the planned development. In fact, the 25,000 seat soccer stadium would potentially not even sit on the same lot if built. What is planned, should negotiations work out, is a massive private office park matched with a retail mall and a hotel. Those negotiations though are getting pushback from commissioner Manolo Reyes as well as local opponents such as Bruce Matheson, who claims the redevelopment of the golf course should have gone through a public competitive bidding process and that the city has continuously misled voters through the process. Numerous other opponents argue that there is no reason to get rid of one of the city’s last remaining public golf courses, all of which are heavily used, irreplaceable and support the local youth with programs such as The First Tee, especially with a state-of-the-art Hard Rock Stadium already built.
Reyes worked to force a vote on the proposed agreement before Commissioner Will Gort steps down at the end of the month as he maxes out his term limits but was shot down by majority vote from the commission which claims that the deal is nearly closed and is just pending 3 fair market value appraisals as well as traffic and environmental studies. Already environmental studies have shown the the ground underneath the golf course is full of toxic material and remediation would be in the range of $40 million.
Beckham first moved to have a stadium built at PortMiami in 2014 before the proposal bounced around 4 other sites including county-owned parking lot in Overtown. Inter Miami CF will play at their new Fort Lauderdale Stadium and Training Complex, which is currently under construction. If Miami Freedom Park is ultimately approved the timeframe for development would extend into 2022-2023.
Words Selected To Fill In Crossword Puzzle Façade On Collins Park Garage
Miami Beach’s Planning & Zoning Department and the Collins Park Neighborhood Association have selected the 28 words which will adorn the façade of the new Collins Park Garage in Miami Beach.
Miami Beach’s Planning & Zoning Department and the Collins Park Neighborhood Association have selected the 28 words which will adorn the façade of the new Collins Park Garage in Miami Beach. The words will form a crossword puzzle with with lighting behind perforated metal to highlight the words. The commission will not have final say as city officials ruled that the words will not be a monument, memorial, super graphic sign or part of Art in Public Places. The garage is designed by Allan Shulman and will feature 513 parking spaces, 15,000 SF of ground retail and a public plaza. Site work on the project began in September 2018 after a demolition permit was issued in mid-August 2018. The original proposed design for the garage was by Zaha Hadid but bids came in around $49 million before the city scrapped the design to find one more suitable for the $25 million budget.
The 28 words selected are as follows:
Architecture/ Art/ Design:
John Collins
Russell Pancoast
Al Vrana
Barbara Baer Capitman
Conni Gordon
Carl Fisher
Art Deco
Mediterranean Revival
Postwar Modern
Fauna & flora:
Parrot
Manatee
Dolphin
Avocado
Mangrove
Baobab
Seagrape
Sea Oats
Sea Turtle
Territory/ Neighborhoods/Structures:
Collins Canal
Lake Pancoast
Indian Creek
Cultural District
Beachwalk
Garden
Museum
Memorial
Ballet
Library
Ytech has unveiled 75 Broadway in Brickell: a 52-story collection of 106 homes from $3 million, designed by KPF with ACPV interiors and Enea landscapes. Completion is anticipated in late 2029.